Claremorris Leisure Centre

Project: Claremorris Leisure Centre
Client: Mayo County Council
Completed: 2010
Location: Mayo

New 25 meter swimming pool with Spa, sauna and steam rooms and, leisure centre with gymnasium and fitness studios.

Key design elements comprised of:

  • Pool AHU heat recovery and air-conditioning Heat recovery system that provides pool heating, under-floor heating and domestic hot water from waste energy
  • Gym and Aerobics low energy multi-split air conditioning system and heat recovery plant to provide a high performance of environmental air quality
  • Variable Speed pool pumps and integrated Building controls to ensure excellent building performance achieving a B1 energy rating
  • Energy Efficient LED Lighting throughout the changing rooms
  • Combined UV and Ozone treatment plant to provide excellent water quality and resistance to extended range of potential bacteria water quality
  • Hepalon lined steel filters to provide a sustainable and long lasting installation that can be refurbished in situ
  • Swim timing systems and spectator areas for gala events
  • The budget conscious project was provided with an energy efficient solution that meets exacting standards of comfort, water quality and usability