4-1-705x467.jpg
 
 

This school was included in the Rapid Build Lot 5 programme. This new build meant full Mechanical and Electrical services were needed on site. NLCE designed this building’s services from scratch including lighting plans, emergency lighting and fire detection systems. The school is naturally a ventilated one meaning the building's 

temperature is regualated via openable windows and vents, resulting in low running costs and a comfortable teaching environment.
This school was a pre-cast construction with the inner walls manufactured off site. It contained a special needs unit where recessed services were cast in concrete off site. This allowed zero margin for error.